Site selection + feasibility estimates
Discover prime locations near energy infrastructure. Get power demand, cooling loads, water usage, and ±30% cost estimates—before you hire engineers.
Power supply delays have extended construction timelines by 24 to 72 months. Primary markets are gridlocked.
You won't know real costs until you hire an engineering firm. By then, you've already committed to a site.
Cooling loads, water access, tax incentives, land costs—they vary wildly by location. No single source of truth.
Get ±30% feasibility estimates BEFORE you engage consultants. Site discovery, cost modeling, and market intelligence in one platform.
| Rank | Location | Pipeline | Dist | $/Acre | Type | Score |
|---|---|---|---|---|---|---|
| 1 | 🔒 Enterprise Only | 🔒 Locked | 0.8 mi | 🔒 | 🦄 Unicorn | |
| 2 | 🔒 Enterprise Only | 🔒 Locked | 1.2 mi | 🔒 | 🦄 Unicorn | |
| 3 | 🔒 Enterprise Only | 🔒 Locked | 0.5 mi | 🔒 | 🔥 BTM | |
| 4 | 🔒 Enterprise Only | 🔒 Locked | 1.8 mi | 🔒 | 🔥 BTM | |
| 5 | 🔒 Enterprise Only | 🔒 Locked | 2.1 mi | 🔒 | 🔥 BTM |
Configure your GPU cluster, select cooling technology, and get ±30% cost estimates instantly. Power demand, cooling loads, water usage, CapEx, OpEx—all in one calculator.
Stop guessing. Get real numbers for your proforma.
Unlock the Calculator"I've spent nearly 20 years on energy infrastructure projects—$22B LNG export facilities, offshore platforms in the Gulf, America's first silicon anode battery plant. I've designed 2 GW of power systems and led site selection for a 400,000 sq ft manufacturing facility.
The pattern was always the same: developers pick sites based on land and incentives, then discover the power economics don't work. By then, they've burned months and six figures on consultants.
Brokers don't understand power generation. Engineers get involved too late. Nobody's connecting energy infrastructure to site selection at the feasibility stage.
So I built the tool I wished I had—one that shows you pipeline proximity, runs your cooling loads, and gives you ±30% cost estimates before you engage a single consultant."
Led engineering for a 700-acre facility with 28-foot storm surge walls, 1.5 GW off-grid power island with 10+ gas turbines. All critical infrastructure rated for 192 mph winds.
Led development of America's first silicon anode battery manufacturing facility in Louisiana, plus site selection for 400,000 sq ft second-generation facilities nationwide.
Designed major offshore facilities 150 miles into the Gulf of Mexico, built to survive the harshest ocean conditions including hurricanes.
Design experience in America's most hurricane-prone regions—192 mph wind loads, 28-foot storm surge walls, flood-elevated structures. Plus arctic facilities built on permafrost. If it's hostile, we've engineered for it.
PE-licensed engineer with formal project management training and a mechanical engineering background.
Here's what companies pay for site intelligence that still misses energy opportunities:
3-4 months of work. Great for tax incentives and negotiations—but they don't understand power generation or engineering tradeoffs.
2-3 months for top 2-3 sites. Required before you can validate power availability and get utility estimates.
For large projects, vetting the best option takes months. Speed matters—the best sites don't stay available.
DatacenterScout gives you a head start. Identify high-potential markets in minutes—so you bring a targeted shortlist of counties to your brokers and engineering teams, not the other way around.
Lock in 50% off for life. Only available during early access.
Your $99 reserves your Founding Member spot. Once we launch and you receive access, you'll have 30 days to explore the full product. Not what you expected? Full refund, no questions asked.
After launch, service continues at $49/month. Cancel anytime—but your founding rate is only available while you maintain continuous membership. If you cancel, you'll rejoin at standard pricing ($99/month).